Xiamen factory and overseas warehouse supply porttile electric small two power banks power station outdoor mobile power supply
Save 47%
Original price
$3,380.19
Original price
$3,380.19
-
Original price
$3,380.19
Original price
$3,380.19
Current price
$1,799.99
$1,799.99
-
$1,799.99
Current price
$1,799.99
Product Display
Specification
Product model
|
ES-900
|
|
|
Weight
|
Net weight 6.6KG Package weight7KG
|
|
|
Capacity
|
3.7V/249600mAh( 923.52Wh)
|
|
|
Output power
|
Rated power 900W Max power 930W
|
|
|
Battery type
|
lithium battery pack Recycle more than 500 times
|
|
|
input voltage
|
AC output : 110~220V 50/60Hz
|
|
|
Output voltage
|
220V 50Hz / 110V 60Hz
|
|
|
Output wave
|
Pure sine wave
|
|
|
Overload
|
Disconnect load restart recovery
|
|
|
Short circuit
|
Disconnect load restart recovery
|
|
|
Solar charging
|
Input voltage DC 18V , input power not exceeding 100W
|
|
|
AC charging
|
6~8 H
|
|
|
Product Size
|
36.5*14.5*21.5cm
|
|
|
Working temperature
|
-5~60℃(Below-5° requires customization)
|
|
Product Categories
Company Profile
Shenzhen Coendi Power Technology Co., Ltd. is a high-tech company integrating R&D, sales and promotion. Since its establishment, we have been committed to providing customers around the world with high-quality UPS, portable power supplies, batteries, photovoltaic inverters and other related solar energy products and professional solutions. It is an important enterprise in China's energy industry. We have long-term accumulation and experience in energy storage power supply. We have the industry's top design team, which can provide customers with a variety of personalized customization needs.
Since 2010,We have obtained the management system certification of lOS 9001, ISO 14001, IS045001, and the product has obtained the CE ROHS FCC IEC certification. We have professional support, efficient sales team and competitive price advantage, attracting all over the world customers, our cooperative customers are located in more than 50 countries such as the United States, Canada, the United Kingdom, France, Germany, Australia, Colombia, Chile, and Turkey. Excellent products and excellent service are the basis of our cooperation. I believe we can have very pleasant exchanges and deeper cooperation. I firmly believe that the products we supply can bring you huge profits and a bigger market.
Production Process
Our Advantages
Product packaging
FAQ
Q: Are you original manufacturers?
A: Yes, we are Cohendi the official leading manufacturer of renewable energy in China. We have the full range of products you need.
Q: What payment terms can we use?
A: T/T clause or L/C clause. In the T/T clause, the 30% down payment needs to be paid in advance, and the balance of the 70% should be settled before shipment. In the L/C clause, 100% irrevocable L/C can be accepted without a "soft clause".
Q: Which incoterms 2010 terms can we work?
A: Our Cohendi is a professional international company and accepts all Incoterms 2010 terms. Usually our work is FOB, CIF, CFR and CIP.
Q: How long does the delivery time take?
A: Normally, the product will take about 3-15 days to produce. Most of the time, our regular products can be delivered immediately within 15 days.
Q: How about after-sales service?
A: 365 × 24 full-year service we promise 24 hours a year, even on holidays, which is in line with our policy of always providing response within 15 minutes and completion of work within 24 hours.
Q: Spare parts when you need them
A: We have spare parts centers on all continents to store professional spare parts. We promise that spare parts will be available in Within 72 hours or not more than a week.
Q: What payment terms can we use?
A: T/T clause or L/C clause. In the T/T clause, the 30% down payment needs to be paid in advance, and the balance of the 70% should be settled before shipment. In the L/C clause, 100% irrevocable L/C can be accepted without a "soft clause".
Q: Which incoterms 2010 terms can we work?
A: Our Cohendi is a professional international company and accepts all Incoterms 2010 terms. Usually our work is FOB, CIF, CFR and CIP.
Q: How long does the delivery time take?
A: Normally, the product will take about 3-15 days to produce. Most of the time, our regular products can be delivered immediately within 15 days.
Q: How about after-sales service?
A: 365 × 24 full-year service we promise 24 hours a year, even on holidays, which is in line with our policy of always providing response within 15 minutes and completion of work within 24 hours.
Q: Spare parts when you need them
A: We have spare parts centers on all continents to store professional spare parts. We promise that spare parts will be available in Within 72 hours or not more than a week.